Excavation has begun!

Chappy Thomas, at work digging:

Utility Trench - 250 feet long, from pole to house site, (click on pictures for larger view)

Installation of three lengths of conduit, for electric, phone, and cable:

(click on pictures for larger view)

The trench is filled in!

 

Removing rocks:

and Stumps: